Ribbon cut at first phase of Rockford Riverwalk - WREX.com – Rockford’s News Leader

Ribbon cut at first phase of Rockford Riverwalk

Posted:
ROCKFORD (WREX) -

The first phase of Rockford's Riverwalk is now open to the public.

The multi-million dollar project includes a 236' long cable-stayed bridge connecting the Riverwalk Museum Campus to the Burpee Museum Campus, an amphitheater with seating for small groups or classes, a sitting wall with dock provisions for the Forest City Queen Water Taxi, and several overlook areas for rest stops, food vendors or small gatherings.

The City received a total of $3.4 million in grants from the Illinois Transportation Enhancement Program for the $5.5 million project. The City funded an additional $2 million for design and construction management.

Powered by WorldNow
All content © Copyright 2000 - 2014 WorldNow and WREX. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service and Mobile Privacy Policy & Terms of Service.

Persons with disabilities who need assistance with issues relating to the content of this station's public inspection file should contact Administrative Assistant Trista Truesdale at (815) 335-7856. Questions or concerns relating to the accessibility of the FCC's online public file system should be directed to the FCC at 888-225-5322, at 888-835-5322 (TTY) or at fccinfo@fcc.gov.